D-MAX DMC-20SEC Manual de usuario Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
11
11 May, 2006 DMC-A2 Series (ALD-00029)
Macro Sensors Tel. (856) 662-8000
www.macrosensors.com
Installation
STEP A Prepare the Panel
1) Cut a hole in the panel to suit the panel
cutout. See panel cutout sizes above.
STEP B Install the Meter
1) Remove both mounting clips from the meter.
2) Push the meter into the panel cutout from the
front of the panel.
3) Attach both mounting clips to the meter from
the rear of the panel and push them towards
the front of the panel until the meter is firmly
held.
STEP C Connect the Cables
1) Connect all input and output signal cables to the
connector pins (See
Connector Pinouts
for details).
2) Connect the power cables to the connector pins
(See
Connector Pinouts
for details).
WARNING
AC and DC power supply voltages
are hazardous. Make sure the
power supply is isolated before
connecting to the meter.
1
2
3
Installation Procedure
1
2
3
Figure 4 – DMC-A2 Series Installation Sequence
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 27 28

Comentarios a estos manuales

Sin comentarios